-
Stony Creek (VA) Riparian Restoration and Stream Habitat Improvement
-
This projected will restore stream and riparian habitat within Stony Creek, located in the state of Virginia.
Located in
Resources
/
Whitewater to Bluewater W2B
-
Stream Bank & Riparian Restoration along the Wild and Scenic Cossatot River on the Ouachita NF
-
Six riparian sites have severe erosion from loss of riparian vegetation and heavy recreational use. Riparian habitat function will be restored by stabilizing stream banks and planting vegetation. Stream habitat cover will increase with addition of materials to repair stream banks. Campsites will be designated and hardened. To measure effectiveness, water samples taken every 3 months over the past 4 years will continue for at least the next 4 years by the Cossatot River Watch Stream Team to compare pre- and post-restoration.
Located in
Resources
/
Whitewater to Bluewater W2B
-
Tampa Bay Seagrass Transplanting Project
-
This project is a seagrass transplanting project within Tampa Bay, Florida.
Located in
Resources
/
Whitewater to Bluewater W2B
-
Ulele Springs Restoration Project
-
This project, run by the Ecosphere Restoration Institute, Inc, will create a natural spring and restore native wetland vegetation within the state of Florida.
Located in
Resources
/
Whitewater to Bluewater W2B
-
Using positive interactions between bivalves and seagrass to reduce habitat fragmentation and restore essential fish habitat
-
Lead by the University of North Carolina at Chapel Hill, this project will restore eelgrass cover that had declined by propeller scaring through introducing mussels. A natural fertilization and predator protection interaction study will also take place.
Located in
Resources
/
Whitewater to Bluewater W2B
-
Valley River Watershed Habitat Restoration Project
-
Located in
Resources
/
Whitewater to Bluewater W2B
-
Valley River Watershed Habitat Restoration Project
-
Valley River is an outstanding aquatic resource in the mountain region of North Carolina; however,303(d) listing and habitat degradation haw become more consistently the norm across the watershed. To address these problems, HRWC established,enhanced and estored adequate riparian buffers along the banks of the stream, restored aquatic habitat by reducing sedimentation and adding large woody debris in appropriate areas, and educated watershed residents about the river and these needs. (Photo: Murphy Track Site During)
Located in
Projects
/
SARP
-
Watershed-Based Approach to Channel Stabilization and Sediment Control in Pleasant Run Creek
-
Excessive sediment from channelized tributaries of the Hatchie River (TN) are degrading downstream aquatic habitat. Pleasant Run Creek is a channelized tributary to the Hatchie River, exhibiting significant soil erosion and channel incision problems. This project seeks to implement channel stabilization measures on private lands that will improve riparian habitat on Pleasant Run Creek and reduce sediment loading to the Hatchie River.
Located in
Resources
/
Whitewater to Bluewater W2B
-
Wolf Pen Gap OHV Trail Complex Stream Crossing Improvement
-
This project will improve stream crossings and trails at the Wolf Pen Gap OHV Trail Complex in Arkansas. It will also improve connectivity and open stream habitat for fish.
Located in
Resources
/
Whitewater to Bluewater W2B